Oracle

X Ads Command Center

Credit Line T1712051 · Oracle America, Inc · Snapshot 2026-08-06

Daily report delivery

Active

Full 5-section Credit Line brief every morning at 9:00 AM America/New_York, with the latest pacing and live campaign mix. Delivered by email + in-app notification.

Next: Fri, Aug 14, 9:00 AM EDT
Email + Grok notification
Credit Line QTD Spend
$7,062

of $185.0K InQ GUT

Pacing vs Flight
3.8%

52.9% through flight · Δ -49.1%

Daily Run Rate
$196

Ideal $2,721/day

EOQ Projection
$13.3K

7.2% of InQ if no change

Oracle Q3 GUT
$595.0K

37.2% of $1.60M goal

Oracle Credit Line (T1712051)

18ce55dlbib · IO 171205101 · @Oracle

Under-pacingLive
IO Total
$300.0K
InQ GUT
$185.0K
QTD Spend
$7,062
Flight
36/68d
32 days left
Daily spend vs ideal daily ($2,721)Actual avg $196/day
Pacing
3.8%
of InQ GUT spent
Pacing delta
-49.1%
vs % through flight
Q2 on this account
$1.42M
served across closed campaigns

1. Executive Summary

Oracle Credit Line · Daily ops read · Aug 6, 2026

Action required · 24h
  • LoseCredit Line (T1712051) is critically under-pacing: $7,062 spent (3.8%) vs 52.9% of flight elapsed. At $196/day you project only $13.3K EOQ — a $171.7K shortfall vs $185.0K InQ GUT.
  • LiveLive mix (ops-confirmed): 5 active campaigns — 3× Website Traffic + 2× Video Views (0 Engagement). Scale Database + Apps Traffic lanes first; keep Product Video mid-funnel; hard-cap F1 Warm-Up until Amplify IO locks.
  • WinQ2 closed campaigns delivered $1.42M on $1.38M booked (102.9% delivery). Database NAM + Apps EMEA/NAM were the volume engines; F1 Red Bull hit 99.0% of budget.
  • ROIOracle Q3 sits at $595.0K GUT (37.2% of $1.60M goal). $410.0K pipeline (F1 + Healthcare/Apps/Database) is back-loaded into September — live CL Traffic lanes + Product Video must prime audiences now or Sep launches start cold. Playbook unlock: ~$136.6K–$218.5K protected + incremental Q3/Q4 revenue in 30–60 days.